1. Which Annex provides model language for adopting jurisdictions to determine the degree to which an existing emergency management facility can be modified to meet the requirements for a 708-compliant designated critical operations area (DCOA)? Required Question
2. Which Annex recommends a 72 hour capacity for the signaling systems between widely separated DCOA's? Required Question
3. What method is recommended in Annex F for improving availability in existing DCOA's? (Pick one of the following) Required Question
4. While there will be much initial confusion and conflict surrounding NEC Article 708 among engineers, contractors, AHJs and others responsible for critical operations power systems, there will be no conflict between Article 708 and other NEC Articles. Required Question
5. A notable example of an aspect of NEC Article 708 that will require additional effort and fee are: Required Question
6. Initially, lack of experience with NEC Article 708 suggests that: Required Question
7. No knowledgeable non-governmental user has anything to gain by complying with Article 708.  Required Question
8. Which one of the following aspects of a critical operations power system does NEC Article 708 not apply? Required Question
9. (Slide 10) Who does Article 708 require to conduct witness testing of the complete system upon installation and periodically afterward? Required Question
10. One of the differences between Article 708 and Articles 700, 701 and 702 is the requirement for automatic transfer of loads in Article 708. Required Question