1.
Interdependencies for greening data centers include:
Site power use
Cost
Impacts to the environment
Reliability
All of the above
2.
Kosik's "Circle of Innovation" does NOT include:
Analyze
Measure
Improve
Discuss
3.
ASHRAE Standard 90.1, Energy Efficiency for Commercial Buildings, is germane to data centers.
True
False
4.
Cooling tower water use can be a significant consumption parameter for data center cooling systems
True
False
5.
Running a data center at higher load levels is one way to optimize it.
True
False
6.
NFPA 70E and OSHA are germane to data center design
True
False
7.
Adding components in parallel generally does NOT require some form of re-programming or re-balancing
True
False
8.
Having a factory-trained technician on site at start up is all that's required to commission a system
True
False
9.
In the case study by Vali Sorell, PE, the owner wanted:
Replace CRAC units with more efficient models
Replace chillers with more efficient modles
Add VFDs to the cooling towers
All of the above
10.
The case study described resulted in a payback of less than 3 years
True
False